Avenida de Doctor García Tapia, 34 is a charging station located in Madrid, Madrid. This charging station has a total of 1, of which 1 are fast charge connectors.
It was added on 20/10/2022and last updated on 26/09/2023.
We recommend that you consult the photos and comments posted by our community, as they provide useful information about the charger's condition. Once your charging session is over, you can add your own comments and photos to help other users and drivers decide where and how to charge their electric vehicle next time.
Avenida de Doctor García Tapia, 34 isn't the charging point you need, check at the bottom of the page for your nearest charging point under "nearest charging points" and you'll see a list of other electric vehicle charging points nearby, along with their location in a parking lot, above ground and their distance in KM.
In the charging station information section, you can view everything you need to charge your vehicle. The exact address of the charging point Avenida de Doctor García Tapia, 34 is available, as well as directions on how to get there, the price of charging at this point and instructions on how to easily charge your vehicle.
For real-time status of charging points in Madrid, Electromaps provides real-time charging point information in the application.
If this
Madrid charger isn't right for your car, there are other solutions. You can check out other chargers in
Madrid or travel to other cities such as
Alcobendas,
Alcalá de Henares,
Alcorcón, as they are nearby and located in
Madrid.
COMMENTS
siguen sin funcionar
los han colocado al revés!!!
Siguen sin estar operativos
Se encuentran en la Calle Carmen Amaya, 13 (Justo por detrás del Centro de Salud Arroyo de la Media Legua). Hay 3 estaciones de carga, un Raption 100 y un trío de 50. Todavía no están operativas.
sigue sin haber nada aquí
Todavía ni existe
El Ayuntamiento de Madrid ha autorizado la construcción de un cargador delante de la Avenida del Doctor García Tapia, 34 (Centro de Salud Arroyo de la Media Legua). No se si ha comenzado su construcción y si no lo ha hecho cuando comenzará.
Está todavía sin instalar